Transportation and Logistics

  1. Home
  2. Investment Attraction>Investment Environment>Logistics

Transportation and Logistics

Logistics

Railways

  • Convenience of logistics guaranteed by 11 railway routes and 88 stations
  • KTX in service from Seoul to Gimcheon/Gumi (80 min), Daegu (100 min), Singyeongju (115 min), and Pohang (120 min)
Railway Type Section Project overview Scheduled completion
Donghaejungbu Line Single-track Pohang ↔ Samcheok
  • Duration: 2008–2022
  • Length: 166.3 km (single-track)
  • Total cost: KRW 3.3896 trillion
2022
Donghaenambu Line Single-track Pohang ↔ Singyeongju ↔ Ulsan
  • Duration: 2009–2021
  • Length: 76.5 km (double-track)
  • Total cost: KRW 2.6667 trillion
2021
Jungang Line Double-track Dodam ↔ Yeongcheon
  • Duration: 2010–2022
  • Length: 145.1 km (double-track)
  • Total cost: KRW 4.0541 trillion
2022
Daegu Line Double-track Dongdaegu ↔ Yeongcheon
  • Duration: 2006–2020
  • Length: 38.6 km (double-track)
  • Total cost: KRW 0.76 trillion
2020
Daegu Line Double-track Yeongcheon ↔ Singyeongju
  • Duration: 2010–2021
  • Length: 20.4 km (double-track)
  • Total cost: KRW 0.5682 trillion
2021

Airports

  • Daegu International Airport (17 international routes to 3 countries), Pohang Airport (domestic routes only)
  • Incheon International Airport by a 30-min flight from Daegu International Airport (2 flights per day)

Expressways

  • 8 expressways (Gyeongbu, Jungbunaeryuk, Jungang, Donghae∙Ulsan-Pohang, Sangju-Yeongcheon, Gwangju-Daegu, Iksan-Pohang, and Dangjin-Yeongdeok), 20 national roads, and 49 local roads that connect to everywhere in Korea
Roads Section and length Interchanges (ICs) in Gyeongsangbuk-do Scheduled completion Construction note
Pohang-Yeongdeok Pohang to/from Yeongdeok
30.92 km
Ocheon, Namyeongilman, Bukyeongilman, Yeongdeok, and Cheongha ICs 2023 Duration: 2016–2023
Total cost: KRW 1.1872 trillion
Daegu Circle Seongseo Industrial Complex to/from Ansim
32.4 km
Seongseo Industrial Complex, Jicheon, and Ansim ICs 2020 Duration: 2012–2020
Total cost: KRW 1.3201 trillion

Ports

Marina development
  • In Uljin from 2016 to 2020, for a total cost of KRW 61.2 billion
  • To feature mooring, repair, and storage facilities for yachts and boats as well as commercial and lodging facilities
Yeongilman Port, Pohang
  • From 1992 to 2020, for a total cost of KRW 2.8463 trillion
  • Features 16 berths, 7.3 km of seawalls, and a hinterland of 1,264,000 ㎡ in area
  • A railway, extending 11.7 km into the port, to be completed in October 2019
  • A free trade zone amounting to 840,000 ㎡ in area
  • An international passenger pier to be established in August 2020
담당부서 :
 Gyeongsangbuk-do Provincial Gove
전화번호 :
 054-880-4614
Promoting investment in Gyeongsangbuk-do
Gyeongsangbuk-do Investment Promotion Office,
the best investment partner for a successful business in Gyeongsangbuk-do